There will be two projects. Information and Assignments will be posted here as they become available.
Project 1
Phase 1
1/15/2013: The turnin command in Section 5 of the writeup had an extra asterisk; the correct command is "turnin -c meam620 -p proj1phase1 -v *"
1/14/2013: Small bugfix for nargin in dijkstra.m and test regions in collision_test.m
1/11/2013: Phase 1 assigned.
Phase 2
1/21/2013: Phase 2 assigned.
Phase 3
2/06/2013: Updated to match phase 2
2/05/2013: Adding nanoplus parameters.
2/04/2013: Phase 3 assigned.
Phase 4
3/29/2013: Report DUE
2/18/2013: Assignment updated and code posted
2/17/2013: Phase 4 assigned
Project 2
Phase 1
3/11/2013: Phase 1 assigned
Phase 2
3/30/2013: Phase 2 assigned
Phase 3
4/20/2013: Template for hover controller uploaded
4/18/2013: Writeup updated, changes are marked in red.
4/16/2013: Dataset updated
4/12/2013: Phase 3 assigned